7 min read

Growing pains.

In May 2026, Mitchell Shire Council published a report with an uncomfortable finding. The Northern Growth Corridor, the stretch of Melbourne’s fringe running through Wallan, Beveridge, and Whittlesea, is the only major growth corridor in the city without a committed public hospital. Residents in Wallan and Beveridge are travelling more than 30 kilometres for emergency care.

It’s not a small oversight. It’s what happens when a region’s population grows faster than anyone planned for, and the services meant to support it never get the chance to catch up.

That’s the real story of the north this year. Not just how fast it’s growing, but what’s at risk of being left behind while it does.

 

Victoria’s New Fastest-Growing Municipality

Mitchell Shire, covering Wallan, Beveridge, Kilmore, and Broadford, is now officially Victoria’s fastest-growing local government area. The shire grew 4.2% in the year to June 2025, the fastest rate of any LGA in the state.

The forward numbers are what make this genuinely different from anything else happening around Melbourne. Mitchell’s population is projected to grow from 64,175 in 2025 to more than 221,000 by 2046, a 245% increase. Mitchell Shire Mayor John Dougall didn’t undersell it: this is a shire on track to triple in size, and by his own council’s assessment, growing at a scale even Victoria’s other booming growth areas haven’t had to plan for.

Beveridge carries the heaviest load. Its population sat at 9,120 in 2024. By 2041, it’s projected to exceed 73,000, making it the largest town in the shire, built almost entirely from what is essentially a standing start.


The Forecasts Are Already Behind

Here’s a detail worth sitting with. In neighbouring Wollert, inside the City of Whittlesea, official forecasts published as recently as 2023 projected a 2041 population of 33,726. As of February 2026, independent analysis puts Wollert’s actual population at around 46,062, an increase of 88.7% since the 2021 Census.

In other words, Wollert has already blown past a population figure it wasn’t supposed to reach for another fifteen years. That’s not a forecasting error so much as a sign of how quickly this corridor is moving. Plans built on last year’s numbers are already out of date by the time they’re approved.

Why the Hospital Story Matters to Everyone Working Here

Mitchell Shire Council’s own framing of the health infrastructure gap is worth repeating directly: the pattern in earlier growth areas was housing arriving first and services following years later. Mitchell’s council believes they’re repeating that pattern now, only at three times the scale, without the stronger service base that helped earlier growth corridors absorb the lag.

Health infrastructure and telecommunications infrastructure aren’t the same thing, but the underlying failure mode is identical. Both get planned on population figures that are stale before construction finishes. Both get treated as something that can be sorted out once people have already moved in. And in both cases, the people who pay for that gap are the residents who assumed the essentials would be ready when they arrived.

A family moving into a new build in Beveridge doesn’t distinguish between “no nearby hospital” and “no working internet on day one.” Both are the same experience: infrastructure promises that outpaced the infrastructure itself.

The Connection Doesn’t Stop at the Front Door

There’s a version of this story that ends once the NBN box is active and the home is connected. In a corridor like this one, that’s where it actually starts mattering more.

If residents in Wallan and Beveridge are travelling 30 kilometres for emergency care, telehealth isn’t a nice-to-have for these households, it’s often the realistic first option. A family working from home because the daily commute into Melbourne eats hours out of the day needs a connection that actually reaches the home office, not just the front room. None of that works on a good NBN connection alone if the Wi-Fi inside the house can’t carry it to where people actually live their day.

This is the gap that tends to get missed once the pre-installation box is ticked. A home can be technically connected and still function poorly for the people in it, patchy coverage in the back bedroom, no reliable way to run security cameras or smart devices, a router sitting in a cupboard doing its best with a floorplan it was never suited to. In a fast-growing corridor where residents are already leaning harder on connectivity than most, that gap costs more than it would somewhere established.

It’s part of why we’ve started working further inside the home alongside builders, not just getting the connection to the door, but helping make sure it actually performs once someone’s living there, Wi-Fi coverage designed for the floorplan, security systems that suit the household, set up before handover rather than bolted on after. Same principle as pre-installation, just carried one step further into the home.

What This Means for Anyone Building Here

The lesson from Mitchell Shire’s own report isn’t “slow down”, growth at this scale isn’t going to stop for anyone’s planning cycle. The lesson is that services and infrastructure need a seat at the table from the start, not a retrofit once a town’s population has already tripled.

For connectivity specifically, that means:

  • Treating population forecasts as a floor, not a ceiling, given how consistently this corridor is outpacing its own projections
  • Locking in carrier and Statutory Infrastructure Provider arrangements well before a stage settles, since waiting for confirmed numbers means waiting for numbers that are already out of date
  • Running pre-installation on the same timeline as the home build itself, managed by the builder as construction progresses, not left to the civil stage with an assumption that there’s a grace period to catch up later
  • Keeping one accountable point of contact across the process, so builders aren’t left managing gaps the same way residents are currently left managing a 30 kilometre drive to emergency care

The Bigger Picture

Mitchell Shire isn’t an outlier anymore, it’s the new benchmark for how fast a Victorian growth corridor can move. Whittlesea isn’t far behind, forecast to grow by 175,000 people between 2016 and 2041, an 84% increase for the municipality overall. Together, this corridor is adding a small city’s worth of people to Melbourne’s fringe, and its own council is now on the public record saying essential services haven’t kept pace.

That’s the risk every builder, developer, and infrastructure provider working here needs to plan around, not just how many people are coming, but whether what they need on arrival will actually be there.

We’ll be watching Beveridge and the push for its train station closely in future editions.

Building in Melbourne’s North? Let’s Make Sure Connectivity Isn’t the Next Gap.

At One Wire, we plan telecommunications infrastructure to move at the pace growth actually happens, not the pace it was forecast to happen, and increasingly that means looking past the front door too, working with builders to get the in-home setup right before handover, not after. If you’re working in Wallan, Beveridge, Wollert, or anywhere else across the Northern Growth Corridor, Book a Catch-Up.