Telecommunications Solutions for Residential Estate Developments
Seamless Connectivity for a Master-Planned Estate

Day-One Internet for Master-Planned Residential Developments
Reliable Telco Solutions Delivered Before Homeowner Handover Day
Location: Clyde North, VIC
Ongoing Scope: Project Scope: 120-lot Residential Estate
Challenge:
Our developer was developing a large estate in Melbourne’s growing southeast corridor. They needed a reliable way to ensure every home had a working internet connection at the time of handover — a frequent sticking point for new homeowners.
Solution:
We worked closely with the developer and their builder to embed the NBN Pre-Installation Program into their build process. By coordinating early with NBN and verifying pit and pipe compliance, we ensured the fibre equipment was installed well before practical completion.
Result:
- 98% of homes connected prior to handover
- No delays due to missing NBN infrastructure
- New homeowners had internet from day one
- “NBN Ready Homes” as a competitive selling point